000 01131cam a22003014a 4500
001 2003052824
003 DLC
005 20151013135806.0
008 030502s2003 enka b 001 0 eng
010 _a 2003052824
020 _a1840645369
040 _aDLC
_cDLC
_dDLC
050 0 0 _aHD9685.A2
_bE36 2003
082 0 0 _a333.91'4
_222
100 1 _aEdwards, B. K.
_q(Brian Keith),
_d1954-
245 1 4 _aThe economics of hydroelectric power /
_cBrian K. Edwards.
260 _aCheltenham, UK ;
_aNorthampton, MA :
_bEdward Elgar,
_cc2003.
300 _axiii, 178 p. :
_bill. ;
_c23 cm.
440 0 _aNew horizons in environmental economics
504 _aIncludes bibliographical references (p. 164-170) and index.
520 _aThis book simplified applications-oriented introduction to the sometimes complex problem of scheduling integrated hydroelectric facilities provides a well-written entry-point for a rich field.
590 _agau 23/01/14
591 _aLoans
650 0 _aHydroelectric power plants
_xEconomic aspects.
650 0 _aElectric utilities.
650 0 _aDams
_xEconomic aspects.
942 _2ddc
_cBOOK
999 _c273
_d273